
Build Kitchen and Collaborative Space
Work on this contract comprised of a new interior renovation for the kitchen and collaborative space, and silent rooms, as shown on drawings and specification for the East memorial building. The work included:
- Demolition and construction of a kitchen space, collaborative space, and silent rooms.
- Verification of life safety systems and balance of lighting and HVAC. Relocation of sprinklers as required.
- Installation of sink and painting of all walls.
- Maintenance of all heritage elements inside and outside the space.
Project Info
LOCATION: East memorial building
TYPE: Design/Build
DATE: